Sign In | Join Free | My ecer.jp |
|
Categories | Multi Lens Array |
---|---|
Brand Name: | ChenMu |
Model Number: | CM-S5050-TypeIV-S-12H1 |
Certification: | ROSH,UL,SGS |
Place of Origin: | Zhejiang,China |
MOQ: | 2000 PCS |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 10000pcs/per week |
Delivery Time: | 3-5 working days |
Packaging Details: | Cartons |
Transmittance: | 92% |
Beam angle: | 30° & 60° & 90°&Type II-M&Type III-M&Type IV&Type V |
Suitable led: | SMD 3030 |
Type: | Optical Led Lens, lamp lens or optical lens |
Size: | 50*50MM |
Application: | High Bay Light, High Bay Lamp, Optics and lighting, Indoor Lighting, Led Street light |
Company Info. |
ChenMu Lighting technology co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
12in1 Type IV High Power Led 3030 Street Light Lens For Multi Lens Array
Quick detail
Product Name: | CM-S5050-Type IV-S -12H1 | Beam Angle: | Type IV-S |
Efficiency: | 93% | Material: | PC |
LED Chips: | 3030 | Dimmable: | L50*50 mm |
Accessory: | SMD LED+PCB+outer shell | ||
Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. |
Description
Specifications
Product Name: | CM-S5050-Type IV-S -12H1 |
Beam Angle: | Type IV-S |
Efficiency: | 93% |
Material: | PC |
LED Chips | 3030 |
Size: | L50*W50 mm |
Accessory: | SMD LED+PCB+outer shell |
Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Application
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |