Sign In | Join Free | My ecer.jp |
|
Categories | Multi Lens Array |
---|---|
Brand Name: | ChenMu |
Model Number: | CM-S23670-A70*160 -40H1 |
Certification: | ROSH,UL,SGS |
Place of Origin: | Zhejiang,China |
MOQ: | 500 PCS |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 10000pcs/per week |
Delivery Time: | 3-5 working days |
Packaging Details: | Cartons |
Usage: | optical |
Material: | Plastic, Optical grade PC,pc |
Item type: | Tunnel Lighting |
Color temperature(cct): | 3000-6500K, |
Led light source: | led,5050,smd |
Light source: | Led |
Company Info. |
ChenMu Lighting technology co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
5050 Led 40 IN 170*160 Degree PC 236*70 Mm PC Multi Lens Array
Quick detai
Product Name: | CM-SZ23670-A70*160°-40H1 |
Beam Angle: | 70*160° |
Efficiency: | 92% |
Material: | PC |
LED Chips: | 5050 |
Size: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Flood Light, Tunnel Light, Street Light |
Other Light Distribution: | 60°/90 °ect |
Description
Specifications
Product Name: | CM-SZ23670-A70*160°-40H1 |
Beam Angle: | 70*160° |
Efficiency: | 92% |
Material: | PC |
LED Chips: | 5050 |
Size: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Flood Light,Tunnel Light, Street Light |
Other Light Distribution: | 60°/90 °ect |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |