Sign In | Join Free | My ecer.jp
ecer.jp
Products
Search by Category
Home > HVAC Systems & Parts >

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

Categories Steel Grider Bridge
Brand Name: Tongkai
Model Number: Truss bridge
Certification: ISO,EN1090,SGS ,
Place of Origin: China
MOQ: 1 set
Price: 1500USD ~2000USD/ton
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 3000/month
Delivery Time: 45days
Packaging Details: Nude and Steel case
Material: S460J0,S355JR,S355J0,Gr65,Gr50
Load: HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
Lane: Single lane4.2m,Double Lane 7.35m, Three lane:10.5m
Surface Finish: Painted
Load Capacity: High
Application: Steel Structure Bridge
Life: 100 years
Bridge Deck: Steel ,Concrete
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge


Composite' means that the steel structure of a bridge is fixed to the concrete structure of the deck so that the steel and concrete act together, so reducing deflections and increasing strength. This is done using 'shear connectors' fixed to the steel beams and then embedded in the concrete. Shear connectors can be welded on, perhaps using a 'stud welder', or better still on export work, by fixing nuts and bolts.


stud fixing diagram


Shear connectors, correctly spaced to resist the loads, make the concrete work 'compositely' with the steel.

Usually the steel carries its own weight and that of the wet concrete. But when the concrete is 'cured' and has acquired its full strength, then all future loads (traffic, surfacing, wind, water, pressure, seismic loads) are shared by the steel/concrete composite.

The concrete is good in compression, while the steel is good in tension and compression. This composite bridge design can be used in the following ways:


1. Simple Beam Bridges - On short spans (8m, 10m, 15m and then more expensively up to 24m), bridges can be made from a number of beams under the roadway straight across the gap. The bridges benefit the most from composite action.

composte layer diagram

2. Over Truss Bridges - These are similar to simple beam bridges but for longer spans, from say 18m up to approx 100m. The deck is still on top of the steel structure, so goes into compression when deflected.


truss layer diagram

3. Transoms on any type of bridge - Transoms go from side to side across a bridge and carry the deck loads to strong steel frames on either side. This is usually on 'open top' through truss bridges or 'closed-top' through truss bridges.

transoms closed diagram

4. Decking - In a normal steel building the concrete can act together with steel decking, the steel decking taking the place of the regular steel reinforcing bars within the concrete. However in a bridge, the underside of the decking is liable to corrode over time, so is not counted as part of the reinforcement. It is just used as 'lost formwork'.

steel decking diagram

Cheap Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge for sale
Send your message to this supplier
 
*From:
*To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0