Sign In | Join Free | My ecer.jp |
|
Categories | Seamless Steel Pipe |
---|---|
Brand Name: | TOBO |
Model Number: | AISI 420 |
Certification: | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin: | China |
MOQ: | 1 pcs |
Price: | Negotiation |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 10000 PCS per month |
Delivery Time: | 15- 20 work days |
Packaging Details: | In wooden case or according to client's requirement |
Product name: | ANSI Seamless 6m length Stainless Steel 304L Schedule 40 Tube Fitting Pipe |
Material: | Stainless Steel |
Technique: | Hot Rolled,Cold Drawn,welded steel pipe |
Type: | SMLS |
Standard: | DIN, ASTM, JIS, DIN 1626, ASTM A106-2006, JIS G3463-2006 |
Surface: | Galvanized Coated |
Processing Service: | Welding, Cutting |
Surface treatment: | according to customer request |
Packing and Shipping: | In wooden case |
Company Info. |
TOBO STEEL GROUP CHINA |
Verified Supplier |
View Contact Details |
Product List |
ANSI 6m Length 304L Seamless Steel Pipe Schedule 40
Product Decription:
Product Name | ANSI Seamless 6m length Stainless Steel 304L Schedule 40 Tube Fitting Pipe |
Standard | ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751,ASTM B 444, ASME SB444, |
Size | 1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Wall thickness | SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Material | Carbon steel, stainless steel, alloy steel, duplex stainless, nickel alloy steel |
Applications field | The elevated temperature strength, excellent corrosion resistance
and work ability at 700℃ properties made it use in a wide range of
high requirement environments. |
Detail Images:
-Sufficient Forging, Heating, Machining Equipment
-In-house Inspection Instruments for Quality Controlling
-Competitive Price & High Quality Assurance
-Fast, Effective and Efficient Services
-Directly supplier of Danieli Metallurgical Equipment
-Experienced Professinonals on Communications
Delivery& Packing:
Packaging: In wooded cases , pallets or according to clients'
requirements
Shipping: Tianjin port, Shanghai port and the other main ports in
China
FAQ:
We are manufacturer with over years experiences.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
>
![]() |