Sign In | Join Free | My ecer.jp |
|
Categories | Roll Forming Equipment |
---|---|
Brand Name: | SUSSMAN |
Model Number: | SS-FD |
Certification: | CE |
Place of Origin: | WUXI CHINA |
MOQ: | 1 set |
Price: | negotiable |
Payment Terms: | T/T, L/C |
Supply Ability: | 10 sets per month |
Delivery Time: | 65-75 days after deposit |
Packaging Details: | standard packing |
Type: | Fire Damper Blade Roll Forming Machine |
Thickness: | 0.6-1.0mm |
Rolling Speed: | About 10m/min |
Motor Power: | 5.5 kw |
cutting Power: | 4 KW |
Way Of Drive: | 1.2 inch chain |
Company Info. |
Sussman Machinery(Wuxi) Co.,Ltd |
Verified Supplier |
View Contact Details |
Product List |
Width Adjustable Fire Damper Blade Roll Forming Machine 100mm-250mm
Width
Technical Parameter
Items | Specifications | |
Material of coil | Material Thickness | 0.6-1.0mm |
Un Coiler | 3 tons manual | |
Forming system | Rolling Speed | About 10m/min |
Roller Stations | About 12 stations feeding | |
Roller Material | Gcr15 coated with chrome | |
Maim Motor Power | 5.5 kw | |
Motor cutting Power | 4kw | |
Cutting | Material Of Cutting | CR12mov with quench treatment |
Hardness | HRC58-62 | |
Tolerance | +-1.5mm | |
Electrical control system | Electric Source | 415 V, 50HZ,3 phase |
Control System | PLC (Panasonic) as list in the note | |
Weight | About 4 tons | |
Way Of Drive | 1.2 inch chain |
Machine list
Machine list | 3 ton passive de-coiler | 1 set |
Main roll forming machine | 1 set | |
PLC Control box | 1 unit | |
Hydraulic station | 1 unit | |
Out table | 1 unit | |
One 20 feet GP Container |
Technological process:
Uncoiling—feedingwithguide———Rollforming——Cutting ——Products
collecting
Profile Drawing
Samples
Application:
Advantage for Fire Damper
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
![]() |