Sign In | Join Free | My ecer.jp
ecer.jp
Products
Search by Category
Home > Earth-moving Machinery >

Front End 3 Ton Wheel Loader , Mini Front End Loader 2200kg Rated Load

Categories 3 Ton Wheel Loader
Brand Name: MCLLROY
Model Number: MCL940 ZL940
Certification: CE,ISO9001
Place of Origin: China
MOQ: 1 Set
Price: $ 4000-6000 /Unit
Payment Terms: 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability: 100 sets / month
Delivery Time: 5-8 working days
Packaging Details: Nude ,3 Sets Fasten Packing in 1 40HQ
Moving type: Wheel Loader
Type: Front Loader
Engine power: 76kw
Engine Brand: Yunnei YN4102 Supercharged
Emissions: EU Stage II
Condition: New
Rated Load: 2200kg
Bucket Capacity: 1.2m3
Dumping height: 3500mm
Alex: Large-Hub
Max. Travel Speed: 28 km/h
Machine weight: 5800KG
Dimension(long * breadth * high): 6330*2170*3080mm
After-sales service provided: Engineers available to service machinery overseas,Video technical support,Online support
Hydraulic Cycle time -: ≤ 6 s
Min. Ground Clearance: 400 mm
Axle Base: 2560 mm
Brake: Air Brake
Wheel Base: 1640 mm
Dump Reach: ≤ 650 mm
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Front End 3 Ton Wheel Loader , Mini Front End Loader 2200kg Rated Load

Small Front End 3 Ton Wheel Loader MCL940 ZL940

1. Products Description

MCLLROY wheel loader is wildly used in construction, agriculture ,garden,etc. And we are experiencing in making high quality efficiency productivity.Strong power and chassis help to muddy road condition,flexible turning is suitable for small space ,excellent unloading height helpful for loading.

For the axle of this loader, we use cast steel small axle housing. There are iron axle and Isuzu axle on the market. The axles play a key role in loader working and walking. Especially under severe working conditions, the internal forces of the axles is large. A good axle allows users to drive safely and work with confidence.


2. Specification

MODELMCL 940
ENGINEEngine ModelYun Nei 4102 Supercharged
RPM2400
Rated Power76 kW
EmissionsEU Stage II
WEIGHTSOperating Weight6100 kg
Rated Load2800 kg
BUCKETSBucket Capacities1.2 m³
TRANSMISSIONMax. Travel Speed28 km/h
Gear BoxCVT
280 torque converter
AlexLarge hub
Axle Base2560 mm
BrakeAir Brake
HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 6 s
DIMENSIONS(APPROXIMATE)Min. Ground Clearance400 mm
Wheel Base1640 mm
Reach at Max.Dump Height3600 mm
Dump Reach≤ 650 mm
Overall Length - With Bucket6240 mm
Overall Width2040 mm
Overall Height2830 mm
OPERATING SPECIFICATIONSTyre Size1670-24
Breakout Force52 KN
JoystickMachanical
Min. turning radius≤ 6200 mm
STANDARD EQUIPMENTHour meterYes
Tool BoxYes
Dual Hight&Low Speed HandleYes
OPTIONAL EQUIPMENTAir Conditioning/heaterOption
Quick ChangeOption
Multifunctional AttachmentOption
Hydraulic PilotOption

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Tire:A variety of patterns to adapt to different perorations ,solid tires available.

2) Frame:Strong hinge joint.

3) Cab:

I. Electronic oil level indicator.

II. Comfortable seat with safety belt.

III. Intelligent instrument.

IV. Pilot valve hydraulic operation.

4) Wide-opening hood for easier servicing & maintenance of engine.

5) MCLLROY design engine cover,automatic power-off electronic flame-out ,no knife.


4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.


The second step is connecting engine and gearbox, then the third step must be putting them onto the frame.

Put engine on the frame, connect the priority valve, install radiator and water tank;

Add hydraulic transmission oil to the gearbox (add gear oil for mechanical transmission), install the hydraulic transmission oil radiator and pipeline, install the hydraulic oil radiator (the pipeline does not need to be connected), connect the brake caliper pipeline, brake pipeline, connect main reduction (differential) drive shaft.

There are quite so many pipelines here, this step could use many screws and clamps.

In this step, first of all, we must pay attention to the four feet of the frame where the engine is fixed, they have to be level, otherwise, the force is uneven, and there is a risk of cracking in the engine and gearbox housing; and the connection point of the radiator must be fixed with sealant; and then see if the clamp is tight; whether the screws of the transmission shaft are tightened.

2-3 workers will be in charge of this step.



Similar Model:

Cat 903D/906M/907M/908M

XCMG LW156/LW160/LW180/LW186/LW200

Liugong 816C

SDLG LG916 LG918 L918


Cheap Front End 3 Ton Wheel Loader , Mini Front End Loader 2200kg Rated Load for sale
Send your message to this supplier
 
*From:
*To: Chanchiyo Holdings Group
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0