Sign In | Join Free | My ecer.jp
ecer.jp
Products
Search by Category
Home > Plastic Product Making Machinery >

Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³

Categories Low Pressure Foam Machine
Brand Name: ZHMACH
Model Number: ZHF-2017
Certification: CE Certificate
Place of Origin: Guangdong,China
MOQ: one set
Price: inquiry
Payment Terms: L/C, T/T, Western Union
Supply Ability: 1.5 set per month
Delivery Time: shipped in 45 days after payment
Packaging Details: Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
Name: Low pressure foaming machine
Foaming width: 980mm~2250mm
Density: 8Kg/m³~100Kg/m³
Product Width: 1200mm~2300mm (adjutable)
Foaming material Group: 13 groups, man-machine interface, automatically computer control
Max total output: 300kg/min
Mixing –head motor: 37kw
Raw Material: PPG, TDI, MC, A33, T9, Silicone Oil, H2O, Pigment, Ect
Small material tank: 180L/δ1mm stainless steel
Filter tank: 1.5m³/δ4mmA3 steel plate
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³


Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³

(1)Main technique specification:

1, Dimension:Total length 33m×Total width 4m×Total Height 3m,Roller ( 3 m)
2, Foaming material Group: 13 groups, man-machine interface, automatically computer control
3, Foaming width: 980mm~2250mm
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:300kg/min
8, Material spraying way:
① The way of down sprayer head (upper, down, front, back can be adjusted)
② the way of trough overflow pipe.
9, Controlling way of foaming:
①PLC controlling, can continuously foaming two different formulas in one time
②All inverter controlling foaming and work in phase with the production line
③Oven declining board height and width can be adjusted by control box.
④Oven side links width can be adjusted by control box.
10, Mixing –head motor: 37kw

Machine Main Specifications:

Oven Length18mInner Conveyer length

18m

Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
Foaming Width1.0-2.25mConveyer Belt Speed0-8m/min
Foaming Density8-100kg/m3Fall PlateSix section adjustable
Total Power130KWTotal output100-300kg/min
MotorDongguan/SiemensPumpU.S. Viking /Japan Shimadzu/China Shanghai


(2)Transducer Types

ModelPower/kw

Use

QtyBrand
G12037

Mixing head

1Siemens
G1207.5

POP, CaCo3

2Siemens
G1205.5

PPG,

1Siemens
G1204

TDI, Flame retardant

2Siemens
G1202.2

MC, color

2Siemens
G1201.5

Water, Ann, Si, Tin, Color Anti-yellow etc

7Siemens
G1200.75

Spray head

1Siemens
VFD-B5.5/3.7/1.5

Oven inner conveyer line,side conveyer line, cutting machine

3Delta

Terms of Payment: 30% advance payment by T/T upon signing the contract
70% covered by T/T before delivery or sight confirmed L/C.

Installation and Start-up: 2 technicians will be assigned to coordinate installation,commissioning and
training, cost for flight and suitable accommodation plus USD50/day will be charged additionally.

Warranty: 12 months limited warranty. Starting from date of delivery excluding wear parts.
Shipping cost for parts to be replaced during warranty period have to be borne by the customer.

FAQ


Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.



Cheap Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ for sale
Send your message to this supplier
 
*From:
*To: Dongguan Zehui machinery equipment co., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0